raycam01_au
Well-Known Member
Hi Guy's
Just mocking up a rack im doing for a friend,
basic, pulse\heat cord.
Holds 16 tubs, and will have a heat cord set up on the top level also.
castors on the bottom, cutting the side and the back out in a few days, will post as i go.
Will be Routing out the shelves for the heat cord
Just mocking up a rack im doing for a friend,
basic, pulse\heat cord.
Holds 16 tubs, and will have a heat cord set up on the top level also.
castors on the bottom, cutting the side and the back out in a few days, will post as i go.
Will be Routing out the shelves for the heat cord
Last edited: